A) shorten the product life cycle.
B) extend the product life cycle.
C) are too costly for most firms.
D) take place during basic research.
E) end the product life cycle.
Correct Answer
verified
Multiple Choice
A) convenience goods
B) specialty goods
C) customer preferences
D) demographics
E) last year's sales
Correct Answer
verified
Multiple Choice
A) technology.
B) research and development.
C) design planning.
D) product design.
E) a product line.
Correct Answer
verified
Multiple Choice
A) type of technology needed for the new product is the same as the technology used by the existing products.
B) new product is an extension of an existing product line already produced in the factory.
C) human resources requirement for the new product and existing products can be satisfied with the facility's current employees.
D) product design is already completed.
E) existing factory has enough capacity to handle demand for the new product as well as the existing products.
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) variable
B) stock-out
C) opportunity
D) fixed
E) holding
Correct Answer
verified
Multiple Choice
A) routing
B) timing
C) efficient manufacturing
D) tactical
E) analysis
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) basic research.
B) applied research.
C) development and implementation.
D) a lack of research.
E) underfunded research projects.
Correct Answer
verified
Multiple Choice
A) a quality circle.
B) quality control.
C) design planning.
D) a labor-intensive technology.
E) a capital-intensive technology.
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) quality control.
B) inspection.
C) inventory control.
D) quality circle.
E) product design.
Correct Answer
verified
Multiple Choice
A) industrial
B) centralized
C) service
D) stagnant
E) bureaucratic
Correct Answer
verified
Multiple Choice
A) product
B) pooled manufacturing
C) assembly-line
D) group manufacturing
E) process
Correct Answer
verified
Multiple Choice
A) Computer-aided design (CAD)
B) Computer-aided manufacturing (CAM)
C) Computer-integrated manufacturing (CIM)
D) Computer-generated mistakes (CGM)
Correct Answer
verified
Multiple Choice
A) Quality circles
B) Computer-aided design
C) Flexible rotation
D) Robotics
E) Automated process control
Correct Answer
verified
Multiple Choice
A) planning time frame.
B) goal outlook.
C) operational time plan.
D) span of operational management.
E) planning horizon.
Correct Answer
verified
True/False
Correct Answer
verified
Showing 1 - 20 of 221
Related Exams