From the foregoing information,determine the budgeted cell conversion cost per unit.


A) $240.00
B) $268.00
C) $296.00
D) $1,842.50

E) A) and D)
F) All of the above

Correct Answer

verifed

verified

Christmas Express makes wreaths in batch sizes of 12.The cutting & assembly process takes 8 minutes per wreath and the decorating process time is 10 minutes per wreath.It takes 12 minutes to move the wreaths from the cutting & assembly process to the decorating process. ​ (a)Compute the value-added,non-value-added,and the total lead time of the wreath process. (b)Compute the value-added ratio.Round to the nearest decimal.

Correct Answer

verifed

verified

(a) ​ blured image (b)...

View Answer

Maximum effectiveness and efficiency are reached when the lean philosophy is used by both manufacturers and their suppliers.

A) True
B) False

Correct Answer

verifed

verified

From the above schedule,calculate the (a)prevention and (b)appraisal costs.

Correct Answer

verifed

verified

A lean nonmanufacturing process can be accomplished by consolidating,in one area,all of the services provided to a customer.

A) True
B) False

Correct Answer

verifed

verified

Make-to-order companies produce mainly to stock inventory.

A) True
B) False

Correct Answer

verifed

verified

In a lean system,there are more transactions to record than there are in a traditional system.

A) True
B) False

Correct Answer

verifed

verified

The lean philosophy attempts to reduce setup times,which will:


A) increase batch sizes
B) not affect batch sizes
C) increase within-batch wait time
D) decrease within-batch wait time

E) C) and D)
F) A) and B)

Correct Answer

verifed

verified

What do lean manufacturers demand from their vendors?


A) High quality materials
B) Low cost materials
C) On-time deliveries
D) All of the above

E) B) and C)
F) A) and B)

Correct Answer

verifed

verified

D

In a pull manufacturing system,raw materials are released to production based on forecasted demand.

A) True
B) False

Correct Answer

verifed

verified

From the above schedule,calculate the (a)value-added and (b)non-value-added costs.

Correct Answer

verifed

verified

Under a lean environment,employees have the responsibility and authority to


A) purchase inventory.
B) determine output amounts.
C) make decisions about operations,rather than waiting for management.
D) make engineering changes.

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

C

The lean manufacturing philosophy views inventory as an unnecessary waste of resources.

A) True
B) False

Correct Answer

verifed

verified

True

Which of the following is a value-added activity?


A) scrap processing
B) rework
C) preventive maintenance
D) warranty work

E) All of the above
F) None of the above

Correct Answer

verifed

verified

Under the lean production concept,employees are better utilized if they are experts in one operation rather than wasting time training them to learn various production operations.

A) True
B) False

Correct Answer

verifed

verified

Long setups and large batch sizes result in smaller inventories.

A) True
B) False

Correct Answer

verifed

verified

In a lean environment,raw materials are delivered more frequently than in a traditional environment.

A) True
B) False

Correct Answer

verifed

verified

In a pull manufacturing system,raw materials are released to production based on actual customer orders.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is (are) objective(s) of lean manufacturing?


A) eliminating waste
B) increasing inventory levels
C) increased production speed
D) all of the above

E) A) and B)
F) C) and D)

Correct Answer

verifed

verified

Lean manufacturing is also called make-to-stock manufacturing.

A) True
B) False

Correct Answer

verifed

verified