Use of a plantwide factory overhead rate does not distort product costs when products require different ratios of allocation-base usage in each production department.

A) True
B) False

Correct Answer

verifed

verified

Zorn Co.budgeted $600,000 of factory overhead cost for the coming year.Its plantwide allocation base,machine hours,is budgeted at 100,000 hours.Budgeted units to be produced are 200,000 units.Zorn's plantwide factory overhead rate is $6.00 per unit.

A) True
B) False

Correct Answer

verifed

verified

What is the overhead cost per unit for Dings?


A) $65.25
B) $56.75
C) $23.25
D) $64.50

E) A) and C)
F) B) and C)

Correct Answer

verifed

verified

Activity cost pools are assigned to products,using factory overhead rates for each activity.

A) True
B) False

Correct Answer

verifed

verified

Calculate the total factory overhead to be charged to each unit of Hooks.


A) $33
B) $50
C) $11
D) $61

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Determine the activity-based cost for each wire drive unit.


A) $204.13
B) $173.51
C) $744.06
D) $394.12

E) All of the above
F) A) and C)

Correct Answer

verifed

verified

The total factory overhead for Big Light Company is budgeted for the year at $807,500.Big Light manufactures two different products - night lights and desk lamps.Night lights is budgeted for 60,000 units.Each night light requires 1 / 2 hour of direct labor.Desk lamps is budgeted for 80,000 units.Each desk lamp requires 2 hours of direct labor.Determine (a)the total number of budgeted direct labor hours for year,(b)the single plantwide factory overhead rate using direct labor hours as the allocation base,and (c)the factory overhead allocated per unit for each product using the single plantwide factory overhead rate calculated in (b).

Correct Answer

verifed

verified

If the budgeted factory overhead cost is $460,000,the budgeted direct labor hours is 80,000,and the actual direct labor hours is 6,700 for the month,the factory overhead rate for the month is $68.65 (if the allocation is based on direct labor hours).

A) True
B) False

Correct Answer

verifed

verified

Calculate the total factory overhead to be charged to Nooks.


A) $300,000
B) $400,000
C) $488,000
D) $600,000

E) B) and C)
F) A) and B)

Correct Answer

verifed

verified

Kettle Factory produces two similar products - gloves and mittens.The total plant budget is $1,050,000 with 600,000 estimated direct labor hours.It is further estimated that glove production will require 375,000 direct labor hours and mitten production will require 225,000 direct labor hours. Kettle Factory produces two similar products - gloves and mittens.The total plant budget is $1,050,000 with 600,000 estimated direct labor hours.It is further estimated that glove production will require 375,000 direct labor hours and mitten production will require 225,000 direct labor hours.

Correct Answer

verifed

verified

Showing 101 - 110 of 110